One article leaves the line at 12.2 units an hour when production runs as intended, and at 8.6 once every stop and manual cycle is counted. It is the same line, the same people and the same shift, and the two minutes between those figures are capacity the plant has already paid for. We build solutions on your own data that put a figure like that in front of the people who can act on it, run them on your own systems and keep refining them with your team.
2 min 3 sadded to every unit by stops and manual cycles. That is the part of the shift nobody planned for, and the part worth looking at first.
Takt for one article in our showcase environment, recorded data.
01Find the problemStart with your team's working day
→
02Build the solutionDevelop and test it on your data
→
03Put it to workDeploy where your team needs it
→
04Keep improvingRefine it as the work changes
Six Sigma / Where the money goes
The standard time was set once. The line has kept its own record ever since.
A capacity plan, a quote and a delivery promise all rest on one figure, which is how long a cycle takes. In most plants that figure was measured years ago and has been trusted ever since, while the line quietly logs every cycle it runs. Six Sigma, one of the views in Paniax Intelligence, reads those recordings. This is what it shows when you follow a single article from the figure in the plan to the figure on the floor.
Six months of recordings from one cell group in our showcase environment come to 136 articles and 16,879 cycles of normal production. Each article gets its own row with how long a cycle really takes, how much it varies, and its takt with and without stops, so the first question answers itself: which articles are worth a closer look, and which already run the way the plan says they do.
For this article the mean and the median both sit near 4 minutes 56 seconds, which is the figure an average would hand to planning. The tallest bar tells a different story. One cycle in five lands between 4 minutes 19 and 4 minutes 28, half a minute quicker, on the same equipment. Nobody has to invent a better way of running the article, because the line has already shown one.
Each dot is one cycle, in the order it ran. Within a single production run the cycle time is steady, with a spread of about eight seconds, but the level steps up and down from one run to the next and the spread across them all is 28.5 seconds. Something differs between those runs, perhaps the tooling, the material batch, the shift or the programme version. The chart gives your team the date and the hour, and they can usually supply the reason.
At ten in the morning, instead of in next week's report.
The same figures follow the run that is on the line right now, beside the earlier runs of the same article. Two of those earlier runs start near 4 minutes 10 and creep upwards by half a minute, and in the running one the slow cycles turn red as they happen. A drift that is seen during the shift costs a conversation at the cell. The same drift found a week later has already been built into every unit made since.
What it is worth
Do the sum with your own figures.
The gap between the two takt figures is capacity you already own, in machines that are installed and people who are on the shift. Not every stop can be removed, and we would not promise that. What changes is that every one of them is now visible and can be priced, so you can decide which are worth going after. Put in your own figures and see what a part of the gap would mean over a year.
The starting values are from the showcase article above. They are an illustration, and your line will have its own.
Planning and sales
Quote on what the line really does.
A quote built on a standard time that is too generous gives margin away, and one that is too tight loses the order or the delivery date. With the real takt per article, capacity plans and delivery promises rest on the same figures the floor lives with.
Production
See what the stops cost, article by article.
Takt with and without stops, side by side, shows where the hours go and which articles to look at first, so improvement time is spent where it pays back.
Process and quality
Find the drift while it is still cheap.
Distribution, control chart and capability are one click away, with no manual data pulls and no spreadsheets. Every figure exports together with the rules that produced it, so anyone can repeat the calculation.
Pick one line and one question worth answering. We show the real cycle times from your own recordings, on your own systems, and you decide what happens next.
Inside one of Sweden's largest manufacturing companies, the machines thump, whistle, and hiss. You start to follow their rhythm. Then a robot hesitates for a few milliseconds, and the rhythm breaks.
Everything had to stay inside.
No data could leave the factory. We brought our platform onto the customer's own systems, connecting the people beside the machines to the detail coming from the lines.
There it was, on the screen.
The robot finished its movement. The unusual cycle appeared on screen. We could go down to the millisecond and ask: could we save a little time here? What might that mean over a year?
The customer's ideas kept coming.
Our notebooks filled with ideas from the team. Two customer-specific adaptations went into place in the first two days on site. Commissioning was one milestone; the conversations and improvements continue.
Paniax Atlas / Production, logistics and traceability
See how it is made. Know where it is. Understand what happens next.
Atlas follows every part through your operation, from the steel that arrives at the gate through machining, heat treatment, grinding and inspection, past subcontractors and back, all the way to the customer. Your factory is built in Atlas itself, in 3D or 2D, by the people who know where things actually stand, with the cells, racks, robots, forklifts and AGVs that move the work between them.
Atlas demoPaniax
Atlas Showcase environment with example data.
Every part has a trail.
Trace any part and every processing step back to where it came from.
Every order gets an answer.
Atlas weighs stock, purchase orders, deliveries and reservations, and tells you whether to produce, buy in or ship from stock.
Nothing leaves the building.
Atlas runs entirely on your own premises, without an internet connection.
No heavy forms and no save button to forget. Everything is saved as you go, and the only thing anyone does deliberately is approve.
Paniax Intelligence
Follow a question back to the data.
Paniax Intelligence brings your production data into one place, on your own systems, so a question asked on the floor can be answered from the data.
See that something is off while the run is still on.
Production carries on while you investigate. Execution follows output, uptime and sequence balance for the run on the line, and now carries the Six Sigma figures in real time: the running run sits beside the earlier runs of the same article on one control chart with shared limits, and cycles above the upper control limit turn red as they happen.
The cycle time on paper rarely matches the one on the floor. Six Sigma works from the recorded production data, leaves out stoppages and deviations by rules you set, and shows the mean, median and most common value for each article alongside its control chart and capability, so you can see when a process shifted and for how long.
The overview tells you where to look. A closer timeline puts movements, cycles, and warnings alongside each other so the next question can be more precise.
Ask Zora, the built-in assistant, about a production period in your own words, then explore the data behind the answer as a table or chart. Zora proposes; your team decides.
Fine-tuning the platform where the work happens, with the people who know its rhythm.
Product views use recorded and example data from our showcase environment.
Capabilities
The solution has to fit the working day.
Your constraints shape what we build, where it runs and how your team uses it.
01 / Real-time
Catch the moment while it still matters.
Orders pick up. Customer behavior shifts. A familiar pattern breaks. A model following your live data can bring that change into view while your team still has time to investigate and act.
02 / Built on your data
Your team knows what normal looks like.
They know the rhythms, exceptions, and questions that come up every day. We build around that knowledge, training a model on your data and shaping it to fit the way your people work.
03 / Runs where you need it
Sometimes the data cannot leave.
On your own servers, on an edge device beside the equipment, or in your own cloud.
04 / End-to-end
The next idea arrives after you start.
People see the model working and ask what else it could do. We stay involved, from the first look at your data through deployment and the refinements that follow.
How it works
It starts with a conversation.
Tell us where the work gets difficult. We look at the data with you, choose a focused use case, and work through what it would take to put a model into daily use.
01
Show us what happens.
Walk us through the work. Where do people lose time, miss a signal, or have to make a decision without enough information? We choose a question worth answering together.
Define
02
Follow the clues in your data.
We explore the data behind that question and develop the solution around it. Your team's experience helps us judge whether the results make sense in the real world.
Build
03
Bring it into the working day.
The model moves onto the systems where it will be used. We work through the practical details with you, so the answer reaches the people who need it.
Deploy
04
See what the next day teaches us.
Conditions change and new ideas arrive. We keep refining the model with your team, using what you learn from working with it.
Improve
Example models
Where does your team need a clearer view?
A line slows down. A price falls behind the market. An energy reading drifts. Each of them costs money quietly, long before it shows up in a report. Here are four examples of the work a custom model could help your team tackle.
Example model
Process Assistant
A line is running, but something is slowing it down. Follow the live process to look for the bottleneck and give the team a place to start investigating.
Example model
Real-Time Pricing
New orders arrive as the market shifts. Use those incoming signals to adjust pricing while the conditions behind the decision are still current.
Example model
Sequence Intelligence
A customer chooses one product, then another. Learn from that sequence to suggest a next step that reflects how people actually buy.
Example model
Anomaly Detection
An energy reading starts to drift from its usual pattern. Compare it with expected consumption and give your team a reason to take a closer look.
Your question may be different. That is where we start.
Paniax was founded in 2023 in Falköping, Sweden, by Peter Larsson, who has spent more than thirty years building software and companies in Sweden, the Caribbean, London, Singapore, Malta and Beijing, from warehouse systems and research and development teams to quantitative trading and a sports-tech startup.
We build our platform ourselves, from the engine underneath to the screens people use, so the people you meet in the first conversation are the same people who install it beside your machines and keep improving it.
We would rather build something modest that a planner opens every morning than something impressive that ends up in a drawer.
Start with the work
Tell us where the day gets difficult.
The pause you hear on the line. The standard time nobody has checked in years. The decision that still comes down to guesswork. Send us a few lines about the problem and the data you have. Together, we'll see whether a custom model is a useful next step. Suitable projects can start with a free proof of concept.